Yangjiang Sewage Treatment Plant Expansion Project

Date:2022-11-12 16:32:18 Views:0


Project Name: Urban North Sewage Treatment Plant Expansion and Upgrading Project.


Project Overview: The project is located in the Chengbei Sewage Treatment Plant in Jiangcheng District, Yangjiang City, with a total land area of 19706.6 square meters (Phase I and Phase II). The maximum processing capacity of the expansion part is 30000 tons/day, and the maximum processing capacity of the upgraded part is 10000 tons/day. The designed effluent water quality is Grade A standard. The bidding section will enter the construction site at the end of December 2018, and the equipment installation and process debugging work will be completed in April 2020.


The main productive structures of the project include: A/A/O micro aeration oxidation ditch, secondary sedimentation tank and reflux pump room, 1 # intermediate lifting pump station and magnetic coagulation high-efficiency sedimentation tank, 2 # intermediate lifting pump station and magnetic coagulation high-efficiency sedimentation tank, sludge dewatering machine room, transformer room, blower room, dosing room, biological deodorization device, sludge storage tank, auxiliary production buildings including comprehensive building, walls, roads, landscaping, green supporting facilities, electrical supporting engineering, sewage equipment installation engineering, etc.


总平面.jpg

1668696347832492.jpg

1668696385113711.jpg